Plenty of new roadworks are due to start from Monday (Photo: TSPL)

Edinburgh roadworks: scheduled road closures, temporary traffic lights and diversions

Here is a list of all of the published roadworks in Edinburgh which start this week (w/c 20 May).

This is a comprehensive list of all of the road closures due to start from Monday 20 May until Sunday 26 May according to the City of Edinburgh Council website.

Lane and footway closures as required for a roof inspection at the Balmoral Hotel from 9.30am on Monday until 3.30pm on Friday.

5. Princes Street - 20 May to 24 May

Lane and footway closures as required for a roof inspection at the Balmoral Hotel from 9.30am on Monday until 3.30pm on Friday.
Google
Buy a Photo
Carriageway patching with off-peak temporary traffic lights from 9.30am on Monday until 4pm on Friday.

6. Drum Brae South - 20 May to 24 May

Carriageway patching with off-peak temporary traffic lights from 9.30am on Monday until 4pm on Friday.
Google
Buy a Photo
Temporary traffic lights and side roads closed as required with Kirkgate and Mount Vernon Road closed from Monday at 9.30am and Kenilworth Drive and Peveril Terrace closed during phase two of the gas main renewal work.

7. Kirk Brae - 20 May to 14 June

Temporary traffic lights and side roads closed as required with Kirkgate and Mount Vernon Road closed from Monday at 9.30am and Kenilworth Drive and Peveril Terrace closed during phase two of the gas main renewal work.
Google
Buy a Photo
Two-way temporary traffic lights and Gillespie Street closed for sewer repairs from 9.30am on Monday.

8. Gilmore Place - 20 May to 31 May

Two-way temporary traffic lights and Gillespie Street closed for sewer repairs from 9.30am on Monday.
Google
Buy a Photo
View more