Edinburgh roadworks: Scheduled road closures, temporary traffic lights and diversions

Here are all of the published roadworks in Edinburgh which will start this week (w/c 24 June)

Friday, 21st June 2019, 11:58 am
Updated Friday, 21st June 2019, 12:58 pm
Don't get caught out this week - these are the Edinburgh scheduled roadworks (Photo: Shutterstock)

This is a comprehensive list of all of the road closures due to start from Monday 24 June until Sunday 30 June according to the City of Edinburgh Council website.

Eastern city centre junction with Hill Street closed due to a gas main connection, starts at 9am till 5pm
Fountainbridge/Craiglockhart at the Maltings, off-peak temporary traffic lights due to Scottish Water manhole repairs, runs 9:30am - 4pm

Sign up to our daily newsletter

The i newsletter cut through the noise

3-way temporary traffic lights at Redford Road due to Scottish Water manhole repairs, begins 9:30am on Monday and finished at 7pm on Tuesday.
4-way temporary traffic lights at Polwarth Gardens due to Scottish Power cable connections, begins 9:30am on Monday until 4pm on Friday.
Off-peak lane closures at Quality Street due to Edinburgh Council inspection of overhead traffic signals. Starts at 9:30am until 3:30 pm.
This road will be closed for short periods of times as required, at the direction of Police Scotland. Closures will begin 7am on Wednesday until 4pm on 5 July.
North side of junction with Fox Spring Crescent road closed due to Scottish Water manhole repairs. Begins 9am until 5pm on Wednesday.
Lane closures between Jane Street and Stead's Place due to ground investigation works for tram extensions. Begins 9:30am Wednesday until 5pm on Friday.
Road closed at Bedford Court, local diversions as signed due to gas main works. Begins 9:30am on Wednesday until 4pm on Friday.
Contraflow in operation at Mid Liberton/Gilmerton due to Scottish Water manhole cover replacement. Begins 9:30am and ends 3:30pm.
George Square Festival, road closures as event is built, closures whilst event is on and closures whilst event is de-rigged. Begins 7am on Thursday until midnight on 4 Sept.
Temporary traffic lights between Salamander Place and Links Gardens Lane due to BT cabling work and clearing blocked ducts. Begins 9am on Thursday until 5pm on 1 July.
Road closed to northbound traffic and westbound lane closure on Morrison Street due to cabling work. Begins 8am on Saturday until 5pm.
Rolling road closure with traffic held as required due to parade. Route: Abbey Mount - Canongate - High Street - George IV Bridge - Victoria Street - Grassmarket service road - King's Stables Road. 8.45am -10am
Road closed at Gilmore Place due to BT carriageway repairs. Begins 9am on Saturday until 5pm on Sunday.
Lane closures on all approaches with 4-way temporary traffic lights (and temporary pedestrian crossing) due to BT clearing blocked cable ducts. Begins 9:30am on Saturday until 7am on 1 July.
Lane closures between Lorne Street and Smith's Place on Leith Walk due to ground investigation works for tram extension. Begins 9:30am on Saturday until 5pm on 1 July.
Rolling road closures due to a parade, route: New Street - Canongate - High Street - Johnston Terrace - Castle Terrace - Lady Lawson Street - West Port - King's Stables Road. Begins 4:45pm on Saturday till 6pm.
Road closed at the rail bridge between Claylands Road and Clifton Trading Estate due to Network Rail bridge inspection. Begins 11pm on Saturday and finishes 8am on Sunday.
Road closed to westbound traffic between St Andrew Square and Hanover Street, with parking restrictions on southside and central reserve due to building contractor crane lift. Begins 6am on Sunday and finishes 11pm.
3-way temporary traffic lights at Groathill Road North due to Edinburgh Council installation/repair of traffic detection loops. 2-3 hours work, exact times TBC.
2-way temporary traffic lights, South of Cammo Gardens due to installation/repair of traffic detection loops. 2-3 hours work, exact times TBC.
2-way temporary traffic lights at Braehead Road due to installation/repair of traffic detection loops. 2-3 hours work, exact times TBC.
Contraflow in operation and no access to Travel Lodge car park for westbound traffic due to building inspection. Starts 9:30am on Sunday until 4pm.
Citybound lane closure due to Edinburgh International Film Festival closing night event. Starts at 12pm on Sunday until 8pm.
Madeira Place closed in both directions between North Fort Street and Madeira Street due to a local event. Begins 1pm on Sunday and finished 6pm.
Road closure for southbound traffic from Victoria Quay to Lindsay Road due to BT cabling work begins 7pm on Sunday until 6m on 01 July.
Road closed to citybound traffic due to tram track maintenence - these works are weather dependant and may be postponed until next Monday night. Begins 11:30pm on Sunday and finishes 5am on 01 July.
Road closures between Haymarket Yards and Grosvenor Street for network maintenance for Edinburgh trams. Road closed in both directions for 3 nights then closed westbound for 2 nights. Begins Midnight on Sunday until 5am on 5 July.