New waterfront sauna with views of Firth of Forth planned for South Queensferry Marina
The proposed development would feature two saunas, changing facilities and a reception area, with the site offering open views across the Firth of Forth towards the Forth Bridges.
A new waterfront sauna and wellness facility could be built at a popular marina in South Queensferry, giving visitors the chance to enjoy views of the Forth Bridges while they relax.
Plans have been submitted for a new wellness facility to open at Port Edgar Marina, on a waterfront site covering around 120 square metres.
The proposals will see two saunas created at the site, along with changing facilities and a reception area.
Three cold plunge barrels and three outdoor cold-water showers are also included in the plans.


The development has been designed to make use of the existing marina facilities, including its parking and infrastructure.
The site has open views across the Firth of Forth towards the Forth Bridges, which provide a backdrop to the proposed sauna complex.
The larger of the two saunas would measure 12 square metres, while the second would be 8 square metres.
The plans have been drawn up by iDraw Plans, with the proposed building intended to have a simple, maritime appearance.
The supporting statement says timber cladding would be combined with blue profiled metal sheeting and dark grey roofing.
The buildings would be constructed in a demountable form and sit on lightweight foundations or concrete paving slabs.
According to the planning documents, this approach is intended to reduce ground disturbance and the amount of physical intervention required on the waterfront site.
Three wood-fired stoves would be used to heat the saunas, while wastewater would be dealt with through a controlled discharge-to-ground system.
The proposed development site sits just outside the South Queensferry Conservation Area.
The application has been submitted to the City of Edinburgh Council under planning reference 26/03706/FUL.
A decision on the proposed development has not yet been made with the status currently sitting at “awaiting assessment”.